Snow park construction is where a good idea becomes a usable venue. AIM Refrigeration focuses on the details that are easiest to miss at the build stage: pipe routes, drainage, insulation, control points and clearance for future service.
Construction decisions that should be fixed early
Once finishes are installed, changing the refrigeration or drainage route becomes slow and costly.
Envelope and insulation
Confirm panel thickness, sealing and vapor protection before decoration begins.
Drainage and melt water
Set floor slope and drain position so melting snow can be handled cleanly.
Piping and cables
Reserve routes for refrigerant, water and control systems before the room is closed.
Handover and service
Keep enough room for routine maintenance after the venue opens.


What to confirm before quotation
| Scope | Information needed |
|---|---|
| Site status | New build, renovation, mall fit-out or temporary venue. |
| Access | Installation opening, loading route and working hours. |
| Utilities | Power, water, drainage and equipment room location. |
| Handover | Testing conditions, documentation and responsibility split. |
Preparing snow park construction?
Share the site boundary and project conditions. AIM will help identify the interfaces that matter before work begins.